Set Appliance State:

Mains Power Off
Set Multimeter to AC Volts Set meter to measure AC Volts
CH Demand
Turn Hot Water Tap On
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Reset appliance as necessary.
Approximately 6 seconds after mains power is turned on, measure the voltage between pins 4 and 5 (blue and brown wires) at connector J3 on the control PCB.
Mains voltage expected.