Set Appliance State:
Ensure secondary heat exchanger is cool, this can be done by running a hot tap with the boiler switched off
Hot Water Tap OFF
Hot Water Tap OFF
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
1. Allow preheat to run and complete pre heat cycle and return to standby mode indicated by a "0" in the display.
2. Allow the boiler to remain in standby mode.
Does the preheat complete satisfactorily?
2. Allow the boiler to remain in standby mode.
Does the preheat complete satisfactorily?