Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
CH Demand
Disconnect connector X11 from the PCB
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Does the boiler now respond to a CH demand?
Note:
Remember if a white PCB is fitted X11 will be fitted on the middle right of the PCB instead of the bottom right as shown.