Set Appliance State:
Mains Power Off
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage between the red (20) and brown (21) wires at the right hand plug on the PCB.
0V DC should be measured.
Note:
Test must be done within 20 seconds of turning the power on. Repeat test as necessary to ensure correct result.
0V DC should be measured.
Note:
Test must be done within 20 seconds of turning the power on. Repeat test as necessary to ensure correct result.

Isolate as per TOPs P4
and refit as necessary