Set Appliance State:

Gas Off
Set Multimeter to Continuity Set meter to measure Continuity
Isolate Mains Power to appliance as per TOPs P4

Measurement:

Remove Electrode lead from boiler.
Carry out a continuity test between
both ends of the Electrode lead.