Set Appliance State:

Mains Power Off
CH Demand
CH temperature control set to MAX
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Allow the boiler to ignite and run for central heating and reach maximum temperature.
Is the heating operation quiet?
Note:
To reduce the time taken for the test to be completed, the heating circuit can be
reduced by turning off some radiators.