Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
Turn Hot Water Tap On
On/Off Switch Off
Attach black probe to an earth point with crocodile clip
Ensure fan connector is attached to PCB
Disconnect connector from the fan assembly and make safe
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Place red probe over terminal 2 in preparation for monitoring the AC voltage.
On/Off Switch On, Reset boiler as required.
As the boiler carries out its initialisation check (P2 - P3 - P4 shown on display) note the voltage between terminal 2 (fan connector) and boiler earth.  After the boiler finishes its initialisation check (Flow temperature shown on display) the AC voltage should increase by approximately 2.0V AC or greater from the voltage during initialisation.
You will probably need to repeat test several times to confirm test results.