Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
CH Demand
Boiler On/Off switch Off
Remove and disconnect internal programmer
Central Heating Thermostat to Maximum Position
DHW Thermostat to Minimum Position
Gas On
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Boiler On/Off switch On.
Reset lockout if necessary.
With all other heating controls calling for heat, does the boiler now fire?