Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Turn CH flow and return isolating valves OFF
Drain and discharge boiler

Observation:

Remove and inspect by-pass tube for blockages.
Note:
Where an external bypass (or bypass radiator) is fitted to the system it is acceptable to pass this test if the external bypass is operating correctly.