Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Selector switch to CH
Remove bottom facia panel
Remove bottom facia panel
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage at the two test points above the pump live and the pump neutral (blue and brown wires) at connector ST15 (two pin connector) in the centre of the exposed PCB.

Isolate as per TOPs P4
and refit as necessary