Measurement:
Please ensure the following system checks are carried out:
System/ Boiler is correctly charged as necessary.
System/ Boiler is bled of air.
Gas inlet pressure is correct.
Bypass (internal or external to the boiler) is correctly adjusted as necessary.
Ensure sufficient water supply to the appliance.
Ensure any manual reset devices are reset.
Note:
The lockout is reset by gently pressing the reset button for 5 seconds with the main On/Off control set to On position.
System/ Boiler is correctly charged as necessary.
System/ Boiler is bled of air.
Gas inlet pressure is correct.
Bypass (internal or external to the boiler) is correctly adjusted as necessary.
Ensure sufficient water supply to the appliance.
Ensure any manual reset devices are reset.
Note:
The lockout is reset by gently pressing the reset button for 5 seconds with the main On/Off control set to On position.