Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
CH Demand
Gain access to PCB (use Insulation Mat as required)
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Boiler ON/OFF switch ON.
Measure the voltage across terminal marked Lr (Return) on terminal strip marked ST8 and terminal marked N (Neutral) on main terminal strip marked ST12 on PCB.