Adjust, Service, Repair or Replace as necessary
Isolate Water and Gas as appropriate
Location:
In front of the expansion vessel, to the R/H side of the boiler.
| Isolate Mains Power to appliance as per TOPs P4 |
Location:
Upon completion of the fault diagnostics carry out final electrical safety tests and checks as per TOPs (C6).
Refer to ADAPT for further information.
Please leave Feedback about this diagnosis via:
XSOL FEEDBACK FORM
Phone - 722429
or Email - Diaglab@britishgas.co.uk