Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to DC Volts Set meter to measure DC Volts
Turn Hot Water Tap On
Remove connector (blue wires) from modulating solenoid
Boiler ON/OFF switch OFF
DHW temperature selector at MAX
Gas On
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Boiler ON/OFF switch ON.
Allow boiler to ignite and run for at least 4 seconds.
Measure voltage at disconnected connector.