Set Appliance State:
Mains Power Off
CH Demand
Gas On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Boiler ON/OFF switch ON.
Allow boiler to ignite and start to heat system.
Remove heating demand.
Does fan run for approximately 15 seconds and pump run for approximately 4 minutes after burner has shut down?
Allow boiler to ignite and start to heat system.
Remove heating demand.
Does fan run for approximately 15 seconds and pump run for approximately 4 minutes after burner has shut down?
Isolate as per TOPs P4
and refit as necessary