Set Appliance State:

Mains Power Off
CH Demand
Boiler ON/OFF Switch OFF
CH Temperature Selector to Max
DHW Temperature Selector OFF
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Boiler ON/OFF Switch ON.
Allow Boiler to fire and heat the System to a reasonable temperature.
Remove heating demand by turning CH Temperature Selector to minimum. Allow Burner to go out.
Turn CH Temperature Selector to Max.
Is there a delay of approximately 3 minutes before the Boiler re-ignites?
Note: It may be necessary to reduce the heating load by turning off some radiators. This will reduce the time taken for this test.