Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
CH Demand
Heating temperature selector to maximum
Hot water temperature selector to OFF
Programmer or selector switch set to heating and hot water
Gas On
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Allow boiler to fire for a minimum of 1 minute and start to heat CH system.
Remove heating demand.
Does the pump continue to run to dissipate the heat from the boiler?
Note:
Pump overrun is approximately 3 minutes.