Set Appliance State:
Mains Power Off
Use Insulation Mat as required
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Set CH to ON at programmer.
Measure voltage between Grey wire (top connector) and Neutral (bottom connector) of X15.
Mains voltage expected.
Measure voltage between Grey wire (top connector) and Neutral (bottom connector) of X15.
Mains voltage expected.

Isolate as per TOPs P4
and refit as necessary