Set Appliance State:
Use Insulation Mat as required
Turn Hot Water Tap On
Isolate Mains Power to appliance as per TOPs P4
Selector switch to Water
Adjust flow rate at tap to approximately 7 l/min
Gain access to PCB
Selector switch to Water
Adjust flow rate at tap to approximately 7 l/min
Gain access to PCB
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Allow boiler to ignite and heat DHW to approximately 55°C.
Measure the voltage between connections 1 and 3 (two yellow wires) on connector X16 on sequence PCB.
Does the voltage reduce as the DHW is met?
Measure the voltage between connections 1 and 3 (two yellow wires) on connector X16 on sequence PCB.
Does the voltage reduce as the DHW is met?
