Set Appliance State:

Mains Power Off
Use Insulation Mat as required
Set Multimeter to DC Volts Set meter to measure DC Volts
Turn Hot Water Tap On
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Measure voltage between connection 3 (pink wire) on connector X15 on sequence board and a suitable earth point.
Switch selector switch to Water whilst observing the multimeter.
Does voltage reach approximately 30 volts DC?
Note:
It is important that the voltage is observed from the time the selector switch is switched to Water as voltage is only present for a few seconds after boiler begins ignition sequence.