Set Appliance State:

Mains Power Off
Set Multimeter to AC Volts Set meter to measure AC Volts
Turn Hot Water Tap On
Boiler Operating Switch / Programmer set to WATER only
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Measure the voltage across connection FL (Brown wire) and connection FN (Blue wire) on connector CN5 on the sequence control PCB.
Note:
On some models sequence control PCB may have only numbered connections in which case FL will be connection 14 and FN will be connection 15.