Set Appliance State:
Turn Hot Water Tap On
Isolate Mains Power to appliance as per TOPs P4
Gain access to PCB (use insulation mat as necessary)
Boiler Operating Switch / Programmer set to WATER only
Gain access to PCB (use insulation mat as necessary)
Boiler Operating Switch / Programmer set to WATER only
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage across connection 3 (Grey wire) on connector X3 and the Neutral connection 2 (Blue wire) on connector X7 on the main PCB.

Isolate as per TOPs P4
and refit as necessary