Set Appliance State:
Mains Power Off
CH Demand
Boiler Operating Switch / Programmer set to HEATING and WATER
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage across connection 1 on connector X4 and the Neutral connection 2 (Blue wire) on connector X7 on the main PCB.
Note:
If a room thermostat is not fitted a link wire should connect connection 1 and 2 on connector X4.
Note:
If a room thermostat is not fitted a link wire should connect connection 1 and 2 on connector X4.

Isolate as per TOPs P4
and refit as necessary