Set Appliance State:
Mains Power Off
Turn Hot Water Tap On
Boiler Operating Switch / Programmer set to WATER only
Gas On
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Allow fan to run and pilot to ignite, measure the voltage across connection ML (Brown wire) and connection MN (Blue wire) on connector CN3 on the sequence control PCB.
Note:
On some models sequence control PCB may only have numbered connections in which case connections 11 and 12 will be used for test.
Note:
On some models sequence control PCB may only have numbered connections in which case connections 11 and 12 will be used for test.

Isolate as per TOPs P4
and refit as necessary