Set Appliance State:
Mains Power Off
Boiler Operating Switch / Programmer set to WATER only
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage across connection 2 (White wire) on connector X10 and connection 2 marked N (Blue wire) on connector X7 on the main PCB.

Isolate as per TOPs P4
and refit as necessary