Set Appliance State:

Set Multimeter to AC Voltage Set meter to measure AC Volts
Isolate Mains Power to appliance as per TOPs P4
Boiler Operating Switch / Programmer set to HEATING and WATER
Gain access to PCB (use insulation mat as necessary)
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Measure the voltage across connection 1 (Grey wire) on connector X10 and the Neutral (Blue wire, connection 2 marked N) on connector X7 on the main PCB..
Repeat the measurement using connection 2 (White wire) on connector X10 and the Neutral (Blue wire, connection 2 marked N) on connector X7 on the main PCB.