Set Appliance State:
Mains Power Off
CH Demand
Boiler Operating Switch / Programmer set to HEATING and WATER
Boiler Temperature Control in MAX position
Boiler Temperature Control in MAX position
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Observation:
Operate the boiler in CH mode allowing it to obtain a satisfactory operating temperature.
Remove the CH demand. Does the pump overrun?
Note 1:
Do not take sound or vibration as a sign of pump operation.
Note 2:
It may be necessary to reduce heating load by turning off some radiators to reduce time taken for this test.
Remove the CH demand. Does the pump overrun?
Note 1:
Do not take sound or vibration as a sign of pump operation.
Note 2:
It may be necessary to reduce heating load by turning off some radiators to reduce time taken for this test.
Isolate as per TOPs P4
and refit as necessary