Set Appliance State:

Gas Off
Set Multimeter to AC Voltage Set meter to measure AC Volts
CH Demand
Isolate Mains Power to appliance as per TOPs P4
Boiler Operating Switch in HW and CH position
Gain access to terminal strip (use insulation mat as necessary)
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Measure the voltage between Neutral connection (Blue wire, marked N) and connection 2 (Grey wire) on the L/H connector block.