Set Appliance State:
Turn Hot Water Tap On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Allow the appliance to run and reach operating temperature.
Test 1:
Measure the temperature of the hot water at the tap and make a note of the reading.
Test 2:
Measure the temperature of the hot water as it leaves the boiler (measure on the pipe leaving the boiler as indicated by the red arrow, second pipe in from left).
Compare the two readings.
Is the temperature at the tap approximately the same as the output from the boiler or is it significantly cooler?
Test 1:
Measure the temperature of the hot water at the tap and make a note of the reading.
Test 2:
Measure the temperature of the hot water as it leaves the boiler (measure on the pipe leaving the boiler as indicated by the red arrow, second pipe in from left).
Compare the two readings.
Is the temperature at the tap approximately the same as the output from the boiler or is it significantly cooler?