Set Appliance State:

Gas Off
Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
Gain access to PCB (use Insulation Mat as required)
Disconnect plug from spark generator
(Push backwards not downwards, easier if
spark generator is removed from appliance)

WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

During the 3 minute self check:
 
1. Measure the voltage between the brown wire at X1 to a suitable earth point.
    Mains voltage should be present.
 
2. Measure the voltage between the black wire at X1 to a suitable earth point.
    Voltage should be approximately 13V AC.
Allow boiler to continue its self check. When the fan starts monitor
the voltage between the black wire at X1 to a suitable earth point.
 
Shortly after the fan starts the voltage should drop from 13V AC to 2V or lower.
 
Note:
Voltage change should be seen for approximately 5 seconds on each attempt at ignition.