Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB (use Insulation Mat as required)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage between terminals 1 and 5
at connector X2 on the PCB,
Mains voltage should be present.
Note:
This test can be carried out while appliance is doing self check.
at connector X2 on the PCB,
Mains voltage should be present.
Note:
This test can be carried out while appliance is doing self check.

Isolate as per TOPs P4
and refit as necessary