Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Turn Hot Water Tap On
Use Insulation Mat as required
Gain access to PCB
Gain access to PCB
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the AC voltage between pin 43 (black)
and pin 44 (black) on connector CN6.
Expect mains voltage.
Note:
Place the probes in the small holes on the PCB.
and pin 44 (black) on connector CN6.
Expect mains voltage.
Note:
Place the probes in the small holes on the PCB.

Isolate as per TOPs P4
and refit as necessary