Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the AC voltage between pin 46 (brown)
and pin 47 (blue) on connector CN7.
Expect mains voltage.
Note:
Place the probes in the small holes on the PCB.
and pin 47 (blue) on connector CN7.
Expect mains voltage.
Note:
Place the probes in the small holes on the PCB.

Isolate as per TOPs P4
and refit as necessary