Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Remove the connector from the diverter motor
Measurement:
Measure the resistance between each of the pins on CN9
and the diverter motor connector as listed below:
Expect continuity on each test.
Also inspect the condition of the harness, visually checking
for any damaged insulation.
and the diverter motor connector as listed below:
| Connector CN9 | Diverter valve Connector | Pin 20 (Brown) | Pin 1 |
| Pin 18 (Blue) | Pin 2 |
| Pin 19 (Black) | Pin 3 |
Expect continuity on each test.
Also inspect the condition of the harness, visually checking
for any damaged insulation.

Isolate as per TOPs P4
and refit as necessary