Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB (use Insulation Mat as required)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Cancel purge cycle.
Measure the voltage between pin 5 (brown) and
pin 11 (blue) on connector X2 on the PCB.
Expect mains voltage.
Note.
There will be a slight delay before the pump runs and
voltage appears.
Measure the voltage between pin 5 (brown) and
pin 11 (blue) on connector X2 on the PCB.
Expect mains voltage.
Note.
There will be a slight delay before the pump runs and
voltage appears.

Isolate as per TOPs P4
and refit as necessary