Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Remove room stat wires from external controls block fitted on top of control box
Place a link between the 2 connections
Place a link between the 2 connections
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Observation:
Does the pump now run and the boiler recognised the CH Demand?
Isolate as per TOPs P4
and refit as necessary