Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Remove white wires from connections 3 & 5 on integral timer
Put a link in the wires to join them together
Rest them on the top of the plastic cover on the control board.
DO NOT HOLD WIRES
Put a link in the wires to join them together
Rest them on the top of the plastic cover on the control board.
DO NOT HOLD WIRES
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Observation:
Does pump now run for CH Demand?
Isolate as per TOPs P4
and refit as necessary