Set Appliance State:
Mains Power Off
Gas Off
CH Demand
Selector switch to CH CONTINUOUS position
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage across the blue (N) and brown (L) wires at the pump.
Note:
If power has been switched off or CH demand has been interrupted, there will be a delay of between 1 and 3 minutes before the boiler starts.
Note:
If power has been switched off or CH demand has been interrupted, there will be a delay of between 1 and 3 minutes before the boiler starts.

Isolate as per TOPs P4
and refit as necessary