Set Appliance State:
Mains Power Off
CH Demand
Selector Switch in CH CONTINUOUS position
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage across the Blue wire and the Brown wire at the Pump.
Note: There will be a delay of between 1 and 3 mins before boiler starts if Power has been switched off or CH demand has been interrupted.
Note: There will be a delay of between 1 and 3 mins before boiler starts if Power has been switched off or CH demand has been interrupted.

Isolate as per TOPs P4
and refit as necessary