Set Appliance State:
Mains Power Off
CH Demand
Selector Switch in CH CONTINUOUS position
Gas On; Pilot On
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Observation:
After operating the Boiler for several minutes in its CH mode, switch off the CH demand. Does the Pump overrun for approximately 6 minutes?
Note: There will be a delay of between 1 and 3 mins before boiler starts if power has been switched off or CH demand has been interrupted.
Note: There will be a delay of between 1 and 3 mins before boiler starts if power has been switched off or CH demand has been interrupted.