Set Appliance State:
Mains Power Off
CH Demand
DHW Selector in Minimum (-) position
CH Selector in Maximum (+) position
ON/OFF Switch in ON position
DHW Selector in Minimum (-) position
CH Selector in Maximum (+) position
ON/OFF Switch in ON position
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
On the 24 hr clock, to the left side of the Control box, measure the voltage across the right of the two red leads and the blue lead (neutral).
Expect mains voltage.
Expect mains voltage.

Isolate as per TOPs P4
and refit as necessary