Set Appliance State:

Mains Power Off
Set Multimeter to DC Volts Set meter to measure DC Volts
Turn Hot Water Tap On
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Allow boiler to ignite and establish.
Measure for DC voltage across the gas valve modulation coil.
Expected voltage approximately 10 Vdc.
Note:
1. Voltage measured could be either negative or positive, ensure a good connection is made.
2. Ensure a sufficient DHW flow rate to prevent boiler from modulating the burner pressure.