Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Turn Hot Water Tap On
Gain access to PCB (use Insulation Mat as required)
Set selector switch to the OFF position
Set selector switch to the OFF position
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Test 1. Measure for DC voltage across the two reds leads of connector X16.
Expected voltage 39 Vdc (may be a positive or negative voltage).
Test 2. Set selector switch from the OFF position to the DHW/CH position.
Allow boiler to commence its ignition sequence (fan running).
Measure for DC voltage at the same location as test 1.
Expected voltage 0 Vdc.
Expected voltage 39 Vdc (may be a positive or negative voltage).
Test 2. Set selector switch from the OFF position to the DHW/CH position.
Allow boiler to commence its ignition sequence (fan running).
Measure for DC voltage at the same location as test 1.
Expected voltage 0 Vdc.

Isolate as per TOPs P4
and refit as necessary