Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
CH Demand
Gain access to internal clock wiring
Remove the wires from L1 (grey) and L1' (black) and make safe
Place a wire link between L1 and L1' on the internal clock
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Does the boiler now respond to a CH demand ?
(Box appears around the radiator symbol on the display)