Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
CH Demand
Remove all external control wiring connections and make safe
Link out external controls (wire link)
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Does the boiler now respond to a CH demand?
(Box appears around the radiator symbol on the display)