Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to internal clock wiring
Remove the wires from L1 (grey) and L1' (black) and make safe
Place a wire link between L1 and L1' on the internal clock
Remove the wires from L1 (grey) and L1' (black) and make safe
Place a wire link between L1 and L1' on the internal clock
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Does the boiler now respond to a CH demand ?
(Box appears around the radiator symbol on the display)
(Box appears around the radiator symbol on the display)
Isolate as per TOPs P4
and refit as necessary