Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Appliance drained and discharged

Observation:

The Schrader valve is located on the top of the vessel, down the back of the appliance.
Ensure the expansion vessel has the correct amount of charge.
Expected charge should be 1 bar.