Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Turn Hot Water Tap On
Gain access to PCB (use Insulation Mat as required)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Allow the boiler to fire for DHW.
Measure the AC voltage between pins 3 (blue) and 5 (black) on connector CN5.
Expect mains voltage.
Is the voltage as expected?
Measure the AC voltage between pins 3 (blue) and 5 (black) on connector CN5.
Expect mains voltage.
Is the voltage as expected?

Isolate as per TOPs P4
and refit as necessary