Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Attach temperature probes to flow & return
pipes as indicated by the red arrows
pipes as indicated by the red arrows
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Reset the boiler / cancel pump purge as necessary.
Allow burner to ignite and CH to operate.
Measure the temperature differential across the primary heat exchanger.
Expect a differential of approximately 25°C or less
Allow burner to ignite and CH to operate.
Measure the temperature differential across the primary heat exchanger.
Expect a differential of approximately 25°C or less