Set Appliance State:
CH Demand
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Allow the burner to ignite and establish and the boiler to run in CH mode for 30 seconds.
Turn off the CH demand and monitor the pump assembly.
The pump should overrun after demand has ended for approximately 30 seconds?
Does the pump overrun behave as described?
Turn off the CH demand and monitor the pump assembly.
The pump should overrun after demand has ended for approximately 30 seconds?
Does the pump overrun behave as described?